A bid spec gets vandal-resistant hand dryers when every requirement is a number or yes/no a bidder proves from a cut sheet. Set the stainless cover gauge and the maximum projection. Require security fasteners and sensor-only activation with no buttons, a UL listing, a stated warranty term, on-wall repair and a parts lead time. "Heavy-duty" alone proves nothing.
Why "vandal-resistant" isn't a spec
Every hand dryer brochure says durable. A bid evaluator can't score that. In school restrooms the failures are predictable: covers get dented or pried, buttons get jammed, units get pulled off the wall, and broken dryers wait weeks for parts. Each of those has a measurable fix, and that is what the bid should ask for.
The bid spec checklist
Copy this table into your bid or RFQ. Change the values to fit your district, and ask bidders to confirm each line with a cut sheet.
| # | Requirement | Suggested minimum | How bidders prove it |
|---|---|---|---|
| 1 | Cover material | Stainless steel cover and drying chamber | Cut sheet |
| 2 | Cover thickness | 20-gauge stainless or heavier (18-gauge for recessed) | Cut sheet |
| 3 | Fasteners | Security (tamper-resistant) screws on the cover | Cut sheet or photo |
| 4 | Activation | Infrared sensor; no push buttons or exposed mechanical parts | Cut sheet |
| 5 | Projection | 4" or less from the finished wall (ADA protruding-object limit) | Cut sheet dimension |
| 6 | Mounting | Surface: anchors or toggle bolts into the wall. Recessed: stated rough opening | Installation manual |
| 7 | Electrical | Voltage matches your existing circuits (for example 120 VAC); circuit requirement stated | Installation manual |
| 8 | Safety listing | UL listed (state the standard and listing number) | Listing number |
| 9 | Over-temperature protection | Thermally protected heating element | Cut sheet |
| 10 | Dry time | Stated in seconds | Cut sheet |
| 11 | Warranty | State a minimum term for parts and for the circuit board, and what it excludes | Written warranty |
| 12 | Repairability | Repairable on the wall without removing the unit; list of wear parts with part numbers | Parts list |
| 13 | Parts availability | Replacement parts ship within a stated number of business days | Written statement |
| 14 | Documentation | Cut sheet, CAD/Revit files, maintenance guide | Links or files |
| 15 | Accessibility | Installable at the mounting heights your restrooms need (lower heights for younger students) | Installation manual |
Values to watch
- Gauge: lower numbers are thicker. 18-gauge is thicker than 20-gauge. Ask for the gauge of the cover, not just "stainless."
- Projection: ADA limits wall-mounted objects with leading edges between 27" and 80" above the floor to 4" of projection. A recessed unit keeps the corridor clear and is harder to grab.
- Warranty exclusions: many hand dryer warranties, Pinnacle's included, exclude vandalism and malicious damage, so on-wall repairability and parts availability (lines 12 and 13) matter more than the warranty length.
- Voltage: if you're replacing existing units, match the voltage already wired. Changing from 208, 230 or 277 V to 120 V means electrical work.
Keep the bid competitive
Public bids usually have to allow more than one brand. For purchases paid for with federal grant money, 2 CFR 200.319 asks for clear minimum essential characteristics. A "brand name or equivalent" description is allowed when it states the specific features that must be met. Contractors that draft the specifications are barred from competing. Writing your own requirements as numbers, like the checklist above, keeps the bid open and still screens out light-duty units.
Writing a full construction spec for a renovation or new school instead? Use the three-part CSI Section 10 28 13 hand dryer specification.
How Pinnacle's dryers measure up
For reference, here is how Pinnacle's two models answer the checklist. Use the values to set your own minimums.
| Requirement | P3-12S surface-mount | PDC-R10 recessed |
|---|---|---|
| Cover | 20-gauge stainless, 16-gauge galvanized base plate | 18-gauge stainless, beveled (12-gauge optional) |
| Projection | 4" | 7/8" |
| Activation | Infrared sensor, no buttons | Infrared sensor, no buttons |
| Electrical | 120 VAC, 1,250 W (10.4 A), dedicated 20 A circuit | 120 VAC, 1,374 W (11.5 A), dedicated 20 A circuit |
| Listing | UL 499 (#E212260) | UL 499 (#E212260) |
| Over-temperature | Five levels of protection | Five levels of protection |
| Dry time | 12–15 seconds | 12–15 seconds |
| Warranty | 10 years parts, 3 years circuit board | 10 years parts, 3 years circuit board |
| Repair | On the wall; five wear parts | On the wall; five wear parts |
| Parts shipping | Within 24 hours | Within 24 hours |
Files for bidders are in the specifier & submittal center. Part numbers are on the hand dryer parts and repair page.
Or skip the bid
If your district is a member of TIPS or BuyBoard, you may be able to buy without running your own bid. Pinnacle is on TIPS contract 250503 and BuyBoard contract 747-24. See how schools buy Pinnacle hand dryers.
FAQ
What should a hand dryer bid specification include?
The cover material and gauge, maximum projection, security fasteners, sensor activation with no buttons, UL listing, electrical requirements, warranty terms, on-wall repairability and a parts lead time. Each should be stated as a measurable value.
What gauge stainless steel should a school hand dryer have?
Ask for a stated gauge. Pinnacle uses 20-gauge stainless on its surface-mount P3-12S and 18-gauge on the recessed PDC-R10, with a 12-gauge cover available. Lower gauge numbers mean thicker steel.
Can a bid spec name a specific hand dryer brand?
Usually only as "brand name or equivalent," with the features that must be met listed. Federally funded purchases follow 2 CFR 200.319. Check your district's purchasing policy.
Does the hand dryer warranty cover vandalism?
Usually not. Like most, Pinnacle's warranty covers defects, not vandalism. That's why the dryer is built to take abuse, and parts ship within 24 hours for a 15-minute fix on the wall.
Talk to Pinnacle about your school's restrooms
Tell us what you're working on and we'll reply with the right model, a quote and buying options (TIPS or BuyBoard).
Next step
Request a quote to budget your bid, or buy through TIPS contract 250503 or BuyBoard 747-24. See also stop school bathroom vandalism and best hand dryers for schools.
Sources: Pinnacle P3-12S and PDC-R10 cut sheets, installation manuals, product pages and warranty; 2 CFR 200.319; 2010 ADA Standards, Section 307.

